Industrialised Construction

Industrialised Construction

What we do

What Henry Ford did for car manufacturing, we are doing for construction.

We do things differently

Unlike the traditional method, we vertically integrate everything under one roof in our unique 50-acre site in Driffield, Yorkshire – the UK’s largest off-site manufacturing facility.

With five factories and 300,000 square feet of production capacity capable of delivering up to 15,000 units annually, it is where our specialist in-house teams handle design, manufacturing, assembly and delivery.

87% of our work gets done before we ever set foot on site, optimising quality, speed and sustainability. By moving construction into factory settings, we achieve safer working conditions and more consistent outcomes than traditional on-site construction.

With our approach, you don’t get any of the disputes and delays that arise between different contractors – just certainty, quality and better outcomes.

  • Controlled factory environment 
  • Streamlined construction timelines
  • Optimised project scheduling
  • Minimal onsite safety risks
  • Reduced waste
  • Specialist in-house assembly teams
  • Components built to rigorous standards
  • Consistent outcomes
Video Poster